Installing DuraBord temporary flooring protection rolls is quick and easy. Before installation, follow the steps below for maximum protection :

Installation
  • Measure the area first to ensure you have enough product for the space. 

 

  • Make sure the floor is clean and dry before installing. Moisture can impact the effectiveness and longevity of the product if pooled underneath. 
  •  Lay the DuraBord rolls over the desired area. Make sure everything fits together seamlessly for maximum protection. 

 

  • You will need our Joint Tape for this step. You will want to securely attach the butt joints together before securing to the floor. Do not use this tape on flooring. 

 

  • Using the DuraBord Edge Tape, you will need to secure the edges to the floor.